Columbia Heights High School Site Update

Posted by LAURYN GRIMES on 12/18/2019

Lots of progress has been made at Columbia Heights High School!

ACCOMPLISHMENTS

CURRENT/UPCOMING MONTH

Band Room Addition

  • Painting is complete (thank you U.S. Bank volunteers!) and practice room ceilings have been installed.
  • Acoustic wall panel and floor installation is underway.

Auditorium Remodel

  • Acoustical ceiling clouds have been patched and painted.
  • House lights and ADA-compliant lift have been installed.
  • Mechanical and electrical rough-in, stage flooring and painting are all underway.

Gym Stage Remodel

  • The stage has been ordered.
  • Field verification is complete.
  • Light demolition is underway.

Band Room Addition

  • Acoustic wall panels
  • Marker/tack board installation
  • Lighting
  • Flooring
  • Ceilings

Auditorium Remodel

  • Mechanical and electrical rough-in
  • Stage stairs
  • Rigging
  • Performance lighting and sound installation
  • Stage flooring
  • Dress room casework and mirror installation

Gym Stage Remodel

  • Sound and lighting layout
  • Electrical rough-in

 
Take a look at all of the recent updates and photos!